north park studio, Architects LLC
Work at the Orange Library was fairly limited as a result of the original design. It did require a new checkout desk, new desks for the reference librarians, a new entry to the reading garden, a new sign and refinishing of walls originally construction of concrete masonry units. A 3 layer epoxy paint provided a very effective, durable finish that moderated the existing course texture.
No comments:
Post a Comment